TARGETS AND SERVICE PRICES APPLIED IN 2019 FOR THE SERVICES PROVIDED BY REGIONAL DIRECTORATE:
QUANTITY OF SQUARE AS TO BE COLLECTED AS LAND INFRASTRUCTURE:
The land will be collected in TL equivalent of 120 USD.
Currency history will be the base for dry, parcel sales is realized in the year of the first trading day of the Central Bank of the Republic of Turkey.
* Project Review and New Building License Arrangement Service Fee: 0,0050-TL
* Project Review and Alteration License Fees Service Fee: 0,0030-TL
* Construction Permit Arrangement and Inspection Service Fee: 1,50-TL / m2
* Appraisal Archive Service (Project review, zoning document fee): 50,00-TL
* Construction Cost, Ministry of Public Works and Settlement Construction Approximate Unit Costs are determined according to the notification (prices of 2019)
* Opening and Working License of Mortar shall be evaluated with the tariffs of the relevant Municipalities.
PARCEL APPLICATION SERVICE FEE:
5.000 - 10.000 m²: 1.250 TL + VAT
10.000 - 50.000 m²: 1.400 TL + VAT
After 50.000 m²: 2.000TL + VAT The room engineers' room is calculated as the unit price.
WATER FEES AND SUBSCRIPTION FEES:
I. Subscription Fees:
a) Water subscriber fee: 5.000,00 TL
b) Water subscriber price (Tenant tenants): TL 1,500.00
II. Water Fees
a) Water unit prices Operating water (m3) Prices: 0,67 TL / m3b) Site Water (m3) Prices: 0,90 TL / m3
III. Line Linking - Opening Price
a) Line connection cost (first time): 350,00 TL
b) Line opening price (each time) will be taken: 350,00 TL
ELECTRICAL ENERGY FEES AND SUBSCRIPTION FEES:
Subscription Fee: Industrial Electricity Energy Assurance Price: (Unit price approved by EMRA x 0.6 x Transformer Power) Industrial External Electrical Energy Assurance Price: (Unit price approved by EMRA x (Establishment Power (kw) Note: The subscription fee can be taken as TL cash, Bank Letter of Guarantee or DBS.
Energy Tariffs:
a) INDUSTRIAL SUBSIDIARIES - 1 ACTIVE ENERGY (TL / KWH): AOSB energy purchase cost + AOSB industrial distribution fee approved by EMRAEED ENERGY (TL / KVARH): TEDAŞ UNIT PRICE
b) INDUSTRIAL SUBSIDIARIES - 2 ACTIVE ENERGY (TL / KWH): AOSB energy purchase cost + AOSB not approved by EMRA industrial distribution distribution costPRODUCTIVE ENERGY (TL / KVARH): TEDAŞ UNIT PRICE CHANGE OF ORGANIZATION, CHANGES UNIT PRICES, It will be reflected.
d)Energy Connection and Switching Cost: AG: 0-15 kW (inclusive): EPDK ca Approved Tariff 100 kW (inclusive): EPDK ca Approved Tariff Over 100 kW: EPDK ca Approved Tariff Cutting, Binding: EPDK ca Approved Tariff MV: 0-400 kVA (inclusive): EPDK ca Approved Tariff Over 400 kVA: EPDK ca Approved Tariff Cutting, Binding: EPDK ca Approved Tariff will be taken.
NATURAL GAS PRICE:
BOTAŞ A.Ş. natural gas sales tariff applied to our regional directorate in the relevant month. MANAGEMENT AİDAT (1 year): 0,75.-TL / m2 (will be paid in 2 equal installments in 6th and 12th months)
WASTEWATER TREATMENT SHARE PARTICIPATION SHARE:
- Domestic Wastewater Unit Price: 1,00.-TL / m3 + ASAT Wastewater unit price: 0,518.-TL / m3. - Industrial Wastewater Unit Price: * pollution coefficient (k) x 1,00-TL / m3 + 0,518.-TL / m3 (ASAT Wastewater Price) * Pollution coefficient (k): from the industrial wastewater of the facilities in the plant, a one-year average of the analysis results obtained in the samples taken in 2017 is determined for each facility. Calculations; According to the yür Wastewater Connection and Tariff Regulation ife entered into force with the decision of the Enterprising Committee dated 13/08/2003, the pollution values have been taken into consideration as stated in Article 12. - Amount of Wastewater: Water used as standard